GENERAL FUND CAPITAL PROGRAMME 2006/07 TO 2010/11 |
|
|
|
|
Draft Budget
2006/07 For Cabinet 17th January 2006 |
|
Net Programme -
Highlighting City Council Resources to be Used |
|
GENERAL
FUND OTHER SERVICES |
2006/07 Current Approved
Programme |
2006/07 New
Schemes |
Slippage B/F 2005/06 |
2006/07 Total |
2007/08 |
2008/09 |
2009/10 |
2010/11 |
|
Total Net Scheme Cost |
Gross Scheme Cost |
Existing/ New Bid |
Revenue Implications/Comments |
|
Scheme
No. |
£000 |
£000 |
£000 |
£000 |
£000 |
£000 |
£000 |
£000 |
|
£000 |
£000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
28 |
Flood Alleviation Schemes - Investigation Programme |
0 |
|
|
0 |
0 |
0 |
0 |
|
|
0 |
80 |
Existing |
£100 p.a. with budgetary provision |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
On-going repair and maintenance being met from existing
budgets. |
|
|
27a |
River and Sea Defences DEFRA Unapproved |
|
|
|
|
9 |
7 |
|
|
|
16 |
1,173 |
Amended |
|
|
|
27b |
River and Sea Defences DEFRA Approved |
3,019 |
-3,001 |
|
18 |
8 |
|
0 |
|
|
26 |
12,685 |
Amended |
|
|
|
|
Flood Defences |
3,019 |
-3,001 |
0 |
18 |
17 |
7 |
0 |
0 |
|
|
|
|
|
|
|
39 |
Williamson Park Development Strategy |
|
20 |
|
20 |
|
|
|
|
|
20 |
20 |
Existing |
|
|
|
41 |
Middleton Wood Ph.1 / Access Improvements |
|
|
|
0 |
|
|
|
|
|
0 |
68 |
Existing |
|
|
|
06:06 |
District Playground Improvements |
|
100 |
|
100 |
100 |
100 |
100 |
|
|
400 |
400 |
New |
Additional £8k (maintenance of £400 per playground required) |
|
|
06:25 |
District Parks and Open Spaces Improvements(incl. Regents
Park) |
50 |
|
|
50 |
50 |
50 |
|
|
|
150 |
250 |
New |
£50k in 6/7 assumed to be same as Regents Park Scheme |
|
|
06:26 |
Rural Recreation Scheme |
|
40 |
|
40 |
20 |
20 |
20 |
20 |
|
120 |
200 |
New |
|
|
|
06:27 |
Community Pools and Sports Rec Grounds |
|
50 |
|
50 |
50 |
50 |
|
|
|
150 |
150 |
New |
|
|
|
06:33 |
Willow Lane Play Area |
|
|
|
0 |
|
|
|
|
|
0 |
46 |
New |
|
|
|
|
Parks and Open Spaces |
50 |
210 |
0 |
260 |
220 |
220 |
120 |
20 |
|
|
|
|
|
|
|
B/F 2005/06 |
Marsh Cycling and Walking Safer Route |
|
|
|
0 |
|
|
|
|
|
0 |
11 |
Existing |
|
|
|
|
Community Safety |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
33 |
Traffic
Calming Schemes |
|
|
20 |
20 |
0 |
0 |
|
|
|
20 |
70 |
Existing |
|
|
|
33 |
Back
Street Improvements |
40 |
|
|
40 |
|
|
|
|
|
40 |
40 |
Existing |
|
|
|
30 |
Ashton Rd Area Transport Initiatives |
|
|
|
0 |
|
|
|
|
|
0 |
67 |
Existing |
|
|
|
25 |
Denny Beck Bridge Improvements |
|
|
|
0 |
|
36 |
103 |
|
|
139 |
139 |
Existing |
|
|
|
53 |
Millennium Park - Enhancement Project |
|
|
|
0 |
|
|
|
|
|
0 |
188 |
Existing |
|
|
|
06:04 |
Cycling England |
|
|
|
0 |
|
|
|
|
|
0 |
570 |
New |
|
|
|
06:28 |
Car Park Improvement Programme |
|
100 |
|
100 |
50 |
50 |
50 |
50 |
|
300 |
300 |
New |
|
|
|
|
Highways & Traffic |
40 |
100 |
20 |
160 |
50 |
86 |
153 |
50 |
|
|
|
|
|
|
|
16 |
Carnforth Market Town Initiative |
50 |
|
|
50 |
50 |
|
|
|
|
100 |
646 |
Amended |
|
|
|
35 |
Mcmbe Townscape Heritage Scheme |
|
|
|
0 |
|
|
|
|
|
0 |
2,242 |
Existing |
|
|
|
17 |
Lancaster SRB Env Improvements |
|
|
35 |
35 |
|
|
|
|
|
35 |
35 |
Existing |
|
|
|
22 |
Lancaster SRB Programme |
|
|
|
0 |
|
|
|
|
|
0 |
440 |
Existing |
Additional staffing implications from Dec 06 to Dec 08 |
|
|
48 |
Economic Development Zone - Cycling & Walking Network |
|
|
|
0 |
|
|
|
|
|
0 |
524 |
Amended |
|
|
|
15 |
Economic Development Zone - 4/5 Dalton Sq. |
|
|
|
0 |
|
|
|
|
|
0 |
50 |
Existing |
|
|
|
55 |
Economic Development Zone - Quality Bus Scheme |
|
|
|
0 |
|
|
|
|
|
0 |
674 |
Existing |
|
|
|
55 |
EDZ Schemes - Net Slippage 2004/05 |
|
|
|
0 |
|
|
|
|
|
0 |
571 |
Existing |
|
|
|
36 |
Port of Heysham
- Access Improvements |
|
|
102 |
102 |
|
271 |
|
|
|
373 |
475 |
Existing |
Potential one off costs to be
confirmed with budgetary provision |
|
|
38 |
Storey Institute Centre for Creative Industries (Cabinet 13 Dec 05 Min 102) |
|
250 |
|
250 |
250 |
|
|
|
|
500 |
4,890 |
Amended |
|
|
|
34 |
Luneside East 'Urban Village' Lancaster |
|
|
|
0 |
0 |
|
|
|
|
0 |
15,370[1] |
Existing |
|
|
|
06:01 |
Storey Institute-Relocation of TIC |
|
|
|
0 |
250 |
|
|
|
|
250 |
450 |
New |
|
|
|
50/06:30 |
Heysham Mossgate Community Facilities |
|
|
|
0 |
|
|
|
|
|
0 |
4,000 |
Amended |
Rental Issue &
TIC future needs clarifying - potentially up to £110k annually from 2007/08
ongoing revenue costs, £40k ongoing currently budgeted for. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other Economic Development |
50 |
250 |
137 |
437 |
550 |
271 |
0 |
0 |
|
|
|
|
|
|
|
20/06:12 |
IT Infrastructure |
|
|
|
0 |
157[2] |
0 |
30 |
|
|
187 |
195 |
Amended |
|
|
|
18 |
Application Systems Renewal |
125 |
|
|
125 |
425 |
238 |
125 |
|
|
913 |
1,113 |
Existing |
|
|
|
19/06:13 |
Desktop Equipment |
100 |
|
|
100 |
100 |
100 |
100 |
100 |
|
500 |
500 |
Amended |
|
|
|
B/F 2005/06 |
Protect Replacement ( Anite / Task ) |
|
|
36 |
36 |
|
|
|
|
|
36 |
36 |
Existing |
|
|
|
06:14 |
EDMS & Workflow |
|
150 |
|
150 |
150 |
50 |
50 |
50 |
|
450 |
450 |
New |
£27k ongoing revenue costs - budget provision to be confirmed |
|
|
|
Supporting 'Electronic' Government |
225 |
150 |
36 |
411 |
832 |
388 |
305 |
150 |
|
|
|
|
|
|
|
2 |
Salt Ayre
Building Condition Survey |
34[3] |
|
|
34 |
|
|
|
|
|
34 |
34 |
Amended |
|
|
|
11 |
Fire Safety Works |
|
|
15 |
15 |
|
|
|
|
|
15 |
15 |
Existing |
£32k revenue - budget included in R&M for 05/06 only |
|
|
14 |
Customer
Service Centres Other |
108 |
|
275 |
383 |
|
|
|
|
|
383 |
383 |
Existing |
Revenue Implications to be reviewed |
|
|
06:03 |
Lancaster Cemetery Wall |
|
22 |
|
22 |
|
|
|
|
|
22 |
22 |
New |
|
|
|
06:05 |
Morecambe Clock Tower Toilets |
|
150 |
|
150 |
|
|
|
|
|
150 |
150 |
New |
Ongoing revenue
implications unknown at this stage, but will save on existing budget as it is
proposed charging is introduced. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
13/06:07 |
White Lund Depot Improvements |
|
45 |
|
45 |
153 |
|
|
|
|
198 |
198 |
Amended |
Ongoing revenue £5k with no
budget provision |
|
|
06:11 |
Council Owned Property Repairs (excl. Housing) |
|
200 |
|
200 |
|
|
|
|
|
200 |
200 |
New |
Need to clarify revenue/capital split. |
|
|
06:17 |
SASC Building Condition Survey |
|
93 |
|
93 |
58 |
41 |
30 |
30 |
|
252 |
252 |
New |
Need to clarify revenue/capital split. |
|
|
06:18 |
SASC External CCTV |
|
20 |
|
20 |
|
|
|
|
|
20 |
20 |
New |
One off revenue cost
of £5k and ongoing £4k, both with
budgetary provision |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
06:19 |
SASC Spectator Seating |
|
60 |
|
60 |
60 |
|
|
|
|
120 |
120 |
New |
Ongoing revenue cost of £500
with budget provision |
|
|
06:20 |
SASC Bar & Catering Refurbishments |
|
30 |
|
30 |
|
|
|
|
|
30 |
30 |
New |
|
|
|
06:21 |
SASC DDA-Entrance Doors |
|
30 |
|
30 |
|
|
|
|
|
30 |
30 |
New |
|
|
|
06:22 |
SASC Main Hall Lights |
|
18 |
|
18 |
|
|
|
|
|
18 |
18 |
New |
|
|
|
06:23 |
SASC Outdoor Changing Rooms |
|
55 |
|
55 |
|
|
|
|
|
55 |
55 |
New |
|
|
|
06:24 |
SASC Athletics Track |
|
68 |
|
68 |
|
|
|
|
|
68 |
108 |
New |
|
|
|
06:29 |
Morecambe TIC Refurbishment |
|
35 |
|
35 |
|
|
|
|
|
35 |
35 |
New |
Short Term relocation costs
whilst work in progress. Estimated 5% increase in income. |
|
|
06:32 |
SASC Solar Panels |
|
20 |
|
20 |
|
|
|
|
|
20 |
20 |
New |
|
|
|
|
Improving Facilities |
142 |
846 |
290 |
1,278 |
271 |
41 |
30 |
30 |
|
|
|
|
|
|
|
7 |
3 Stream Waste Ph 4 (Cabinet 18th Oct 05
Min 68) |
|
|
|
0 |
|
|
|
|
|
0 |
56 |
New |
At present it is
assumed all capital items will be leased - as per the Cabinet report. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Waste Collection & Recycling |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
General
Fund Other Services Total |
3,526 |
-1,445 |
483 |
2,564 |
1,940 |
1,013 |
608 |
250 |
|
6,375 |
50,864 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
GENERAL
FUND HOUSING |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
37/06:16 |
Disabled Facilities Grants (including £100k top up) |
341 |
55 |
|
396 |
330 |
330 |
330 |
330 |
|
1,716 |
3,861 |
Amended |
Estimated £99k Income to be generated - £88k currently
estimated |
|
|
37/6:15 |
District Wide Home Repair
Assistance |
80 |
20 |
|
100 |
100 |
100 |
100 |
100 |
|
500 |
500 |
Amended |
|
|
|
37 |
West End Masterplan |
0 |
|
|
0 |
0 |
0 |
0 |
|
|
0 |
12,000 |
Existing |
£210k funded by English Partnerships/ NWDA |
|
|
|
Townscape
Heritage Initiative |
357 |
|
|
357 |
|
|
|
|
|
357 |
357 |
Existing |
|
|
|
06:02 |
Bespoke Housing Solutions |
|
1,000 |
|
1,000 |
|
|
|
|
|
1,000 |
1,000 |
New |
|
|
|
06:08 |
Regional Housing Board Funding-West End |
|
|
|
0 |
|
|
|
|
|
0 |
7,500 |
New |
|
|
|
06:09 |
West End - LAA-SSCF-CSGE Funding |
|
|
|
0 |
|
|
|
|
|
0 |
2,100 |
New |
|
|
|
06:10 |
English Partnerships/Exemplar Funding |
|
200 |
|
200 |
|
|
|
|
|
200 |
4,700 |
New |
Delivery team funded by English Partnerships |
|
|
|
Reductions(-) / Increases required to programme |
-278 |
|
|
TBC |
|
|
|
|
|
0 |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
General
Fund Housing Total |
500 |
1,275 |
0 |
2,053 |
430 |
430 |
430 |
430 |
|
3,773 |
32,018 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Estimated Slippage Carried Forward |
-50 |
|
|
|
|
|
|
|
|
0 |
0 |
|
|
|
|
|
Estimated Slippage Brought Forward |
230 |
|
|
|
|
|
|
|
|
0 |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
COMBINED
GENERAL FUND CAPITAL PROGRAMME |
4,206 |
-170 |
483 |
4,617 |
2,370 |
1,443 |
1,038 |
680 |
|
10,148 |
82,882 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FUNDED
BY : |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Use of Capital Receipts (in year) |
707 |
160 |
483 |
1,350 |
1,114 |
50 |
50 |
|
|
2,564 |
|
|
|
|
|
Direct Revenue Financing |
|
|
|
|
|
36 |
103 |
|
|
139 |
|
|
|
|
|
General Unsupported (Prudential) Borrowing |
|
|
|
|
225 |
560 |
215 |
|
|
1,000 |
|
|
|
|
General Supported Borrowing - Housing Schemes (will change to
grant) |
500[4] |
1,020 |
|
1,520 |
430 |
430 |
430 |
430 |
|
3,240 |
|
|
|
|
Specific Supported Borrowing - DEFRA (Sea Defence) Schemes |
2,999 |
-2,999 |
|
|
|
|
|
|
|
0 |
|
|
|
General Capital Grants (Non Specific) |
|
69 |
|
69 |
69 |
|
|
|
|
138 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL RESOURCES |
4,206 |
-1,750 |
483 |
2,939 |
1,838 |
1,076 |
798 |
430 |
|
7,081 |
|
|
|
|
|
|
|
|
|
ANNUAL SURPLUS / (-) SHORTFALL |
0 |
-1,580 |
0 |
-1,678 |
-532 |
-367 |
-240 |
-250 |
|
TRUE |
72,734 |
|
|
|
|
|
|
|
|
|
CUMULATIVE
SURPLUS / (-) SHORTFALL |
|
0 |
-1,678 |
-2,210 |
-2,577 |
-2,817 |
-3,067 |
|
-3,067 |
-10,148 |
|
|
|
|
|
|
|
|
|
|
* Bold
Schemes are new bids (some of which amend exisiting bids in the programme)
for 2006/07 onwards |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|